Instrumentation supervisor

Specializations:
  • Other

Employment: full time, project work

Work schedule: full day, shift schedule, rotation based work

Work experience 12 years 2 months

December 2024currently
7 months
Vega development
I&A supervisor
Construction supervision on a Peschanka copper mining field
September 2022August 2024
2 years
Nova Energies

Murmansk

Instrumentation Supervisor
Supervision and control over the construction works of subcontractors in a scope of Instrumentation discipline. Arctic LNG-2 is a unique LNG (Liquefied Natural Gas) and SGC (Stable Gas Condensate) production, storage and shipment plant with gravity-based structures. The project includes the construction of three LNG trains, with a capacity of 6.6 MTPA of LNG each, and up to 1.6 MTPA of stable gas condensate. The total LNG capacity of the three trains will be 19.8 MTPA. The project employs an innovative construction concept using gravity-based structures (GBS).
August 2018June 2022
3 years 11 months
Tecnimont

www.mairetecnimont.com/

Instrumentation supervisor
Since May 2020 - Omsk refinery project. Delayed coking unit. Construction, pre-com & com supervision of field instruments, F&G system, HVAC, Ruhrpumpen coke cutting system, FAM coke handling system, Yokogawa analyzers Since October 2019 - Amursky Gas Processing Plant Project. Construction supervision. Quality control over all instrumentation construction activities as per the related ITP`s. Issuing an non-conformity reports. Following the construction schedule. Since may 2019 - Moscow CORU project "Euro+". Construction of the Combined oil refinery unit. Quality control over all instrumentation construction activities as per the related ITP`s. Issuing an non-conformity reports. Since august 2018 - The Kingisepp Ammonia Production Plant project with a production capacity of 2,700 tons per day. Supervision of construction, pre-com, commissioning and start-up activities. Performance of loop-checks, functional tests. Troubleshooting. Сontrol over the work of subcontractors. Providing of technical support to vendors (GE Nuovo Pignone S.p.A, Mitsubishi Heavy Industries, KBR, Cryostar, Schneider electric). Inspection and quality check of installed instrumentation objects, Creating of a punch list items. Issuing a non-conformity reports, extra-work requests, warehouse requisition forms. Construction, commissioning, and start-up activities with Mitsubishi compressors.
March 2018August 2018
6 months
Yamata Endustriyel

Tobolsk, www.yamata.com.tr

Chemical Production, Fertilizers... Show more

Instrumentation engineer
TOBOLSK Ethylene Cracker Unit. Pre-commissioning supervision. Performance of loop-checks. Сontrol over the work of subcontractors.
April 2017December 2017
9 months
South Tambey LNG (a joint-venture led by TechnipFMC, JGC and Chiyoda)

Yamalo-Nenets AO

Oil and Gas... Show more

Instrument troubleshooting supervisor
Performance of troubleshooting, fault finding, detected during pre-commissioning and commissioning. Performance of loop-checks, functional tests. Providing of technical support to vendors. Сontrol over the work of subcontractors. The Yamal LNG project is one of the largest industrial undertakings in the Arctic. It will eventually involve the drilling of more than 200 wells, the construction of 3 LNG trains, each with a capacity of 5.5 million tons per year, and a vast gas terminal, and the commissioning (a world first) of 16 icebreaker tankers, each able to transport 170,000 m³.
September 2016March 2017
7 months
LLC "Linde Engineering Rus"

www.linde-engineering.com

Chemical Production, Fertilizers... Show more

Instrumentation Supervisor
Pre-commissioning, Commissioning, and start-up works on the Plant "Ammonia production of 1340 t/d". Providing of technical support to vendors (GE Oil&Gas Nuovo Pignone S.p.A and others) on the field. Performance of loop-checks, functional tests, calibration various instruments such as flow, pressure, temperature, level, transmitters and positioners (Bently Nevada, Rosemount, Vega, Flowserve, Yokogawa, Endress-houser, WIKA). Performance of troubleshooting, fault finding detected during pre-commissioning and commissioning. Adjusting control valves. Operating and maintenance of MINIMAX fire-fighting system, gas alarm system and chemical analyzer containers and boxes. Inspection and quality check of installed instrumentation objects, creating a punch list items. Training the Instrumentation personnel to operate the Plant. Inspection of instrumentation construction activities on site. Participation in the start-up.
May 2016August 2016
4 months
“Promindustria” Saint-Petersburg

Saint Petersburg

Instrumentation engineer/ full employment
Commissioning activities on the oil-and-gas production and processing facilities. Performance of loop-checks, functional tests, checking of installation, calibration various instruments (basically Yokogawa flow control devices, pressure , temperature transmitters, Vega level transmitters, Auma positioners)
June 2014April 2015
11 months
"Angarskaya Neftehimicheskaya Kompaniya "Rosneft`, Angarsk

Angarsk

Instrument mechanic / full employment
Maintanance activities on an Oil refinery plant of Rosneft. Changing, repairing, providing modernizations of field instruments.
September 2011April 2014
2 years 8 months
The branch of "Nevskaya Kosmetica", Angarsk

Angarsk

Instrumentation engineer (Full employment)
Providing trouble free operation of packing machines, blowing machines and injection-molding machines, automatics facilities and control equipment facilities as well as supplementary equipment. Software changing. Working with controllers of the Siemens and Mitsubishi type. Adjustment, fettling, diagnostics, preventive maintenance and modernization of various components. Adjustment of industrial robots. Working with hydraulics, pneumatics and servo mechanisms. As well as performance of functions of electrician (engine repairing, heating repairing and so on), electronic database developing.

Skills

Skill proficiency levels
Пользователь ПК
Английский язык
Пуско-наладочные работы
КИПиА
pre-comissioning
troubleshooting
loop-check
EPC
Construction
Quality Control
Oil And Gas
instrumentation
commissioning
pre-commissioning
HSE
inspections
Start-up works
Functional test
P&id
Supervision
Промышленное строительство

About me

Responsibility, sociability, diligence, interest in the working process, the desire to improve professional skills. Also perfect on literacy Russian language. English: upper-intermediate level B2. + Technical English.

Portfolio

Higher education

2010
National Research Irkutsk State Technical University
Physics and Technology Faculty, Insulating, cable and capacitor technologies

Languages

RussianNative


EnglishB2 — Upper Intermediate


Citizenship, travel time to work

Citizenship: Russia

Permission to work: Russia

Desired travel time to work: Doesn't matter